Company-wide stock figures describe aggregate resources. Availability, MOQ and dispatch dates require confirmation for the exact product and configuration.
Compare the complete quotation.
Quantity basis
Record units per model, capacity, colour and artwork. Ask which minimum applies to each process and whether mixing is possible.
Included costs
Separate cup and decoration, individual packaging, tooling or setup, samples and freight. Record currency and the agreed trade term.
Timing basis
Separate sample preparation, production after approval and transport. Share the required arrival date and destination.
What affects your quotation
Your quote depends on the selected configuration. Please include:
Model / collection reference (e.g. FG-1010, FG-1014, FG-1028 or other shortlist)
Colour / finish preference (approve on physical sample)
Decoration route and artwork (placement, size, colour reference)
Packaging (individual pack, gift box, retail color box, inserts — as applicable)
Destination country and preferred arrival window (planning input; transport quoted separately)
Quantity per model, colour and artwork
We separate cup and decoration, packaging, tooling or setup, samples and freight. Unit price, MOQ and timing are confirmed on quotation — not as a single locked site number.
Digital product and packaging images show design concepts; materials, components and packing are confirmed with your quotation and approved sample.
Honest buying notes
MOQ — Confirmed per model, colour, decoration and packaging. Form quantity ranges are planning guides, not a confirmed MOQ.
Samples — Standard cup → decorated cup → cup with packaging. Fees, freight and any credit: confirm on quotation. See Samples & approval.
Quote factors — Model, colour, decoration, packaging, destination and quantity per artwork. Confirm on quotation / sample.